ホームお問い合わせ

電子機器組立プロジェクトでお困りですか?

PCB Packaging for Shipping: MSL, ESD, Moisture Control

A carton of bare boards lands on a customer’s receiving dock in July. Still, the box looks fine. Inside, one panel has a cracked corner. The pads on a second panel have dulled past their solderability window. And the bag that should have shielded the assembly turns out to be pink poly with no metal layer. However, nobody dropped anything and nothing went to the wrong place. The team simply never wrote a packaging spec. PCB packaging for shipping is the discipline that decides whether boards arrive solderable, flat, and intact. Short answer up front: four threats set the specification: moisture, electrostatic discharge (ESD), mechanical shock, and contamination. Bare boards […]

A stack of bare boards arrived flat, passed incoming checks, and then bowed after the first lead-free reflow. The BGA coplanarity failed, the placement head scraped a panel, and the line stopped for two hours. PCB bow and twist is the measurement that catches this before it happens: for any board carrying surface-mount parts, IPC-A-600 caps it at 0.75%. The root cause is almost never bad luck — it is copper imbalance or an asymmetric stack-up, and the fix starts at layout, not in the reflow oven. Short answer up front: keep flatness at 0.75% or less for SMT boards, 1.5% for through-hole-only boards, measured per IPC-TM-650 Method 2.4.22. Design […]

A customer once sent a drawing marked only “IPC standard, high quality.” Their assembler built to Class 2, the industry default, and the first field returns came from a ventilator program that should have been Class 3 from day one. IPC-A-610 Class 3 is the high-reliability workmanship standard: it demands 100% inspection, complete solder wetting, and void limits roughly half of what Class 2 allows. Choose it when a failure can hurt someone or ground a system — medical life-support, aerospace, defense, automotive safety. For industrial controls, telecom, and commercial electronics, Class 2 is the right call. Short answer up front: IPC-A-610 Class 3 is not a premium badge you […]

A procurement lead forwarded a quote that looked 30% below the field. Two weeks later the invoice arrived with a stencil charge, an expedite fee, and a component overage they had never seen. An accurate PCBA quote starts long before the price — it starts with the files you send. Send four things upfront and the number holds: complete manufacturing data (Gerber or IPC-2581), a bill of materials with real manufacturer part numbers, a pick-and-place/centroid file, and your test plus IPC-class requirements. We have reviewed thousands of RFQs, and the lesson repeats: complete packages quote in hours, incomplete ones drift by 20% or more before the first board ships. Short […]

A buyer emailed at 4 p.m.: the microcontroller on their bill of materials just jumped to a 45-week lead time, and their launch date sits 14 weeks out. PCBA component shortages turn a stable build plan into a fire drill overnight. We have lived this more times than we care to count. In practice, the fix is not panic-buying on the open market — it is asking the right questions before the BOM freezes. Short answer up front: a shortage is a planning failure you can see coming. Ask your assembly partner about long-lead parts, second sources, and proof of authentic stock, and you remove most of the risk before […]

A BGA sits on a medical control board with 400 balls hidden under the body. The AOI vs X-ray inspection question stops being academic the moment a line operator waves the board past the optical camera and it passes — while a 22% void sits inside ball 137, invisible to any lens. We have watched that exact escape reach a customer only once, and it cost a recall. This guide explains, defect by defect, what each method actually sees so you can spec the right coverage before it matters. Engineer’s Note: Treat AOI as proof the board looks right, not that it is right. A clean optical pass says nothing […]

Preserving a solid IC local ground plane beneath high-speed processors is one of the most effective ways to suppress EMI at the source. A 0.5 mm pitch BGA sits on your top layer, and a critical clock trace needs to reach a connector on the opposite side. Do you route directly underneath the package body to save space, or do you maintain an unbroken copper zone? This decision defines whether your board passes EMC testing or becomes a radiating antenna. In our builds, we have seen boards fail CISPR 32 Class B limits specifically because designers routed sensitive signals beneath noisy chips. Actually, the fix was not adding more ferrite beads. It […]

A 0402 capacitor sits 2 mm from the board edge. During SMT assembly, the conveyor rail clamps down and crushes it before reflow even starts. This happens more often than you’d think. In our builds, we see this failure when designers treat the PCB process edge design as an afterthought rather than a first-order constraint. The fix isn’t expensive, but catching it late costs real money in rework and delayed shipments. This guide walks through the exact margins, mark points, and separation methods that keep boards running smoothly on high-speed SMT lines. No theory dumps—just the parameters we verify during every DFM check. Why SMT Rail Clearance Defines Your PCB Process Edge […]

ja日本語

お問い合わせ

このフォームを入力するには、ブラウザのJavaScriptを有効にしてください。
Name
アップロードするファイルをクリックするか、この領域にドラッグします。
=